No Flash

Traditional Window Cleaning

Pride clean UK use ladders where no other means of access or water fed pole is suitable. (e.g. inside buildings, for low level windows and in tight access areas.)

When using a ladder all operatives are equipped with a bucket on a belt to free up both hands so there is always a minimum of three points of contact with the ladder at all times.

All operatives are experienced and competent in using ladders and follow guidelines put in place by the health and safety executive.

Water Fed Pole Cleaning

At Pride Clean UK we use van mounted systems that consist of:

  • Water Softeners
  • A 40inch reverse osmosis unit
  • De-ionising vessel

This system produces ultrapure water which enables us to achieve a streak free finish from the safety of the ground. The company has invested thousands of pounds into this technology and now complies with all health and safety laws regarding working at height.

Other benefits of this technology are:

  • Cleans up to 65ft from the safety of the ground
  • Reaches usually inaccessible areas such as above a conservatory with relative ease
  • Less disruptive than ladders to lawns and patios
  • More client privacy
  • No detergents or chemicals
  • Cost effective

High Access Cleaning

Sometimes on larger contracts specialist equipment is required to gain access to windows above 65ft. Pride clean UK will assess your cleaning needs and carry out a full risk assessment to determine what the most suitable and cost effective piece of equipment is to be used.

Highly experienced operators who are members of the international powered access federation (IPAF) will give a wide range of access platforms from compact machines such as scissor lifts to large hydraulic trucks which will reach up to 100 feet.

Builders Cleans

Pride Clean UK regularly combines our working services with commercial building companies in order to provide a sturdy and professional clean up operation after work has taken place.

We are always able to provide Construction Skills Certificate Schemes (C.S.C.S) for clients and contractors alike, and are also flexible enough to adapt to builders' deadline changes in case particular projects are extended or finished early. We are also a completely insured company, with public liability insurance of £5million.